ABA Plastic Film Blowing Machine Film Extruder Machine Blown Film Machine Recycled Film Blowing Machine
Overview Product Description By using ABA extrusion, plastic bag makers can produce high-strength and lower-cost film ma
Send your inquiryDESCRIPTION
OverviewBasic Info.
Model NO. | GBCE-1200 |
Temperature Controller | Delta |
Optional Device1 | Rorary Die Head |
Optional Device2 | Corona |
Contactor | Schineder |
Screw Length Proportion | 28:1 |
Guarantee | One Year |
Film Thickness | LDPE 0.015-0.20mm; HDPE 0.008-0.05mm |
Material | PE |
After-Sale Service Provided | Engineers Available to Service Machinery Overseas |
Transport Package | Wrapping Film Packing or Packed in Wooden Case |
Specification | CE, ISO9001: 2008, SGS, TUV |
Trademark | SILSTAR |
Origin | Jiangyin City Jiangsu Province |
HS Code | 84773090 |
Product Description
Product Description
By using ABA extrusion, plastic bag makers can produce high-strength and lower-cost film materials. Because of the unique design of die structure for the ABA extrusion,two layers of film materials in different characteristics (A and B) can be recombined into a composite film by changing the molecular direction and structure inside the die head, then the longitudinal tension of film is being significantly improved.If you use recycled granules as the middle layer film B, but use new granules as the outer two layers film A, you can blow high-quality film materials while reducing costs.The machine can also use auto change film roller device, it can save labor and is easy to operate.Product Parameters
Model name | Plastic film blowing machine,ABA blown film machine |
Final product | plastic film |
Application | for plastic bags |
Material | HDPE,LDPE, CaCO3 compound, masterbatch and additives |
Screw size | 45mm*2 set, 30:1 |
Output range | 30-80kg/h |
Optional device | rotary die, double rewinding, automatic change roll device. |
Delivery time | 30-60days |
Warranty | 1 year |
Technical assistance | Oversea Machine commissioning services are available. |
Detailed Photos
Company Profile
Silstar machinery founded in 1997, covers an area of 32,000 m2,we focused on film blowing machine, bag making machines for plastic bag and compostable bag. We have obtained 2 invention patents on garbage bag making machine and labeling machine, 13 utility model patents, which has become one of the leading companies in this industry. By now It has already got the CE certification, ISO9001 quality certification, and ISO45001 safety management certification.SILSTAR Workshop Pictures:Certifications
Packaging & Shipping
Exhibition
FAQ
1. Q: How long will your engineer reach our factory? A: Within 7-15 days after the machine arrives at your factory. |
2. Q: How many days will you finish installing? A: We will finish installation and training within 3-7 days. |
3. Q: What should we charge for your engineer? A: You should charge for the cost of our engineer's visa, round trip tickets, accommodation, and also their salary of 100USD one day per person. |
4. Q: How long is your machine's warranty period? A: All our machines have one year guarantee, starting from the finished installation. |
5. Q: How could we do after one year warranty period? A: We also can do service for you, but you need to pay the salary for my technician 100USD/day. |
6. Q: How could we do if the parts are broken within the warranty? A: We would express the free replacement parts during the warranty date. |
7. Q: Does your engineer understand English? A: Our engineer understands a little English. All of our engineers have more than five years machine installation experience. |
8. Q: How many workers do we need to run those machines? A: Usually need one person to operate the machine. |
9. Q: How do we solve the machine problem after your engineer leaves? A: Generally speaking, there will be no problem after finishing the installation. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according to your description. |
10. Q: How can I visit your company? A: It takes 30 minutes by train from Shanghai to our factory. |